Cabinets & Countertops

Countertop edge profiles compared — eased to waterfall, cheapest to priciest

Picking an edge is picking a fabrication tier. Eased, pencil, and bevel (Tier 1) are the only edges laminate supports and cost the least to run; bullnose, ogee, and Dupont are mid-tier; mitered and waterfall are built-up edges that bond two slab thicknesses, so they cost the most.

Source: EDGE_PROFILES tiers + laminate compatibility from the countertop calculator
Use this diagram free on your site — grab the embed codeGet the code

What this diagram shows

Nine countertop edge profiles drawn as slab-edge cross-sections, ordered from least to most expensive to fabricate. The Tier 1 profiles are eased (a near-square edge with a small radius), pencil round, and a 45-degree bevel — these three are the only profiles available on laminate. Tier 2 adds the half bullnose and full bullnose, a rounded-over edge. Tier 3 adds the ogee S-curve, the Dupont cove, and the mitered built-up edge that laminates two slab thicknesses to look thicker. Tier 4 is the waterfall, a mitered edge that continues vertically down to the floor. The more complex the profile, the higher the per-linear-foot edge upcharge.

Use this diagram — free

You're welcome to use this diagram on your own site, blog, handout, or lesson at no cost. The only condition is a visible credit link back to the source page. Copy the snippet below and paste it into your page — the credit is already included.

Please keep the credit link intact and don't alter the diagram itself. Redistribution as part of a competing diagram library or template pack isn't permitted. Questions? Reach us via the site.

Was this diagram helpful?

Countertop Calculator

Calculate net square feet, slabs, edge LF, seams, and weight for granite, quartz, marble, and butcher block. NSI, ANSI/ISFA, NKBA. Free.

Related diagrams

Related calculators