Tile, Grout & Mortar

Thinset contact coverage — why combed ridges must be collapsed (80% / 95% rule)

Combing the mortar isn’t the goal — contact under the tile is. Ridges left standing leave voids (<80%); sliding the tile to collapse them plus back-buttering gives the ≥95% contact ANSI requires for wet and large-format tile.

Source: ANSI A108.5 §2.2.3 (mortar contact); NTCA trowel-and-error method
Use this diagram free on your site — grab the embed codeGet the code

What this diagram shows

Two cross-sections of a tile set in thinset. On the left, the combed mortar ridges are left standing, so the tile rests only on the ridge tips and leaves big voids underneath — well under 80 percent contact, which causes hollow spots, cracks, and lippage. On the right, the ridges have been collapsed by sliding the tile across them and the tile is back-buttered, giving a nearly full mortar bed with no voids. ANSI A108.5 requires at least 80 percent mortar contact for interior dry installations and at least 95 percent for exterior, wet, and large-format tile. Comb straight lines, set the tile, then slide it across the ridges to flatten them, and back-butter large tile.

Use this diagram — free

You're welcome to use this diagram on your own site, blog, handout, or lesson at no cost. The only condition is a visible credit link back to the source page. Copy the snippet below and paste it into your page — the credit is already included.

Please keep the credit link intact and don't alter the diagram itself. Redistribution as part of a competing diagram library or template pack isn't permitted. Questions? Reach us via the site.

Was this diagram helpful?

Mortar / Thinset Calculator

Pick the right ANSI mortar (A118.1/.4/.11/.15/.3 or A136.1 mastic) for substrate and tile, then get bag count by trowel notch. NTCA, TCNA, ANSI A108.

Related diagrams

Related calculators