A same-amperage panel swap runs $1,300 to $3,000. The most common job — a full 100A to 200A service upgrade — runs $3,000 to $6,000. A jump to 400A is the widest range of all, from as little as $300 for a small subpanel add-on up past $32,500 for a full high-cost-metro service with a smart panel — it is genuinely quote-dependent, so get three bids before you commit.

What you're doing (swap, upgrade, subpanel, or relocation), where you live, and which code-driven add-ons your job needs set most of the price. The tables below break it down, and the interactive estimator lets you combine them — then check your actual load with the free electrical load calculator before you call for bids.

Electrical panel cost by project type

These are installed ranges — equipment plus labor — before code add-ons like a surge protector or a smart panel. A 400A upgrade has no real consensus range in published cost data, so it's shown wide on purpose rather than falsely precise.

ProjectInstalled rangeNotes
Panel swap, same amperage$1,300 – $3,000Failing panel replaced like-for-like, no amperage increase
100A → 200A full service upgrade$3,000 – $6,000New 200A panel, meter base, service mast/conductors, utility coordination — the most common upgrade
Upgrade to 400A$4,000 – $17,000Large homes, EV + solar + all-electric loads — highly quote-dependent, get 3 bids
Subpanel addition$400 – $2,000Adds breaker spaces (garage, ADU, workshop) without touching the main service
Panel relocation$1,000 – $4,000Moving the panel to a new spot in the house — more labor than a straight swap

Estimate your panel upgrade

Pick your project type and region, then toggle the code-driven add-ons that apply to see your range update live.

Your estimated range
$3,000 – $6,000
Likely around $4,200 · 100A → 200A full service upgrade · equipment + labor · national data updated 2026-09-27
Project type
Where you live
Upgrades & extras
Check your load with the electrical load calculator

Get Accurate Pricing From Local Contractors

Compare real pricing from licensed professionals in your area based on your estimate.

  • Free, no obligation quotes
  • Local licensed contractors
  • Faster than manual estimating

Do you actually need an upgrade?

Common triggers:

Lawrence Berkeley National Laboratory estimates 100A and 200A panels make up roughly 55% and 29% of U.S. single-family panels respectively, and that at least 20% of panels of all sizes have no free breaker space left. The same research found many homes can actually accommodate additional loads (like an EV charger) without a full panel or service replacement — 100A alone doesn't automatically mean an upgrade is required; a licensed electrician's load calculation (NEC Article 220) is what actually answers that question.

Common myth: "recalled" panels

Federal Pacific Electric (FPE) "Stab-Lok" panels are widely flagged online as "recalled" — they were not. The Consumer Product Safety Commission investigated Stab-Lok breakers for two years and closed the investigation in March 1983 without issuing a recall, citing insufficient data, while noting it could reopen the matter. Many electricians and insurers still recommend replacing FPE and Zinsco panels on safety grounds, but describe it accurately as a recommendation, not a government-mandated recall.

What the add-ons do to a typical estimate

Priced against the default — a 100A to 200A upgrade at the national average. Each add-on is a flat per-job cost, priced once and added, not stacked; only a pricier region raises it further.

Add-onWhat's involvedAdds
Whole-home surge protectorRequired by NEC 230.67 on new/upgraded services since the 2020 NEC (~$200-$800 installed)+$200 – $800
Smart panel upgradeSpan/Lumin-style load-monitoring panel instead of a standard one — installer-reported pricing, not independently verified+$2,500 – $8,000
Permit feeMunicipal electrical permit for a service change — varies a lot by city; larger cities charge more+$100 – $400

Cost by region

Electrician labor rates vary a lot by state — BLS wage data shows roughly a 1.6x spread between the highest- and lowest-paying states we checked. The same 100A to 200A upgrade across regions:

RegionTypical states100A→200A upgrade
Lower-cost regionMuch of the South (e.g. TX, FL)$2,400 – $4,800
National averageMost metros$3,000 – $6,000
Higher-cost regionWA, IL, CA, NY and similar high-wage states$3,900 – $7,800
StateMean electrician wage
Washington$42.61/hr
Illinois$42.33/hr
California$40.54/hr
New York$40.17/hr
Texas$27.09/hr
Florida$25.18/hr
Example jurisdictionPermit fee
West Valley City, UT$53 (up to 200A); $79.50 (200-400A)
Vancouver, WA$88.20 (0-200A); $129.02 (201-600A)
Upton, MA$175 (200A service change); $75 (subpanel)
Seattle, WA$146-$365 depending on amperage tier, plus a ~$55 admin fee

BLS OEWS, electricians (SOC 47-2111). National mean hourly wage was $34.37 as of May 2025 (BLS news release, May 2026). State-level means below are the latest primary BLS state tables available (May 2023) — the ratios still hold directionally. Base municipal electrical permit fees for a service change, a handful of example jurisdictions — actual fees vary widely by city and by amperage.

Timeline

The physical work is usually a single day (roughly 8-10 hours for a straightforward panel replacement, more for a relocation). Power is off for most of that day, since the utility disconnects service or pulls the meter to work safely. Permitting and utility coordination can take much longer than the work itself. A straightforward panel-only permit is often issued same-day or within a few days, but a full service upgrade that needs new utility-side equipment can enter a utility's planning queue, which is far less predictable and worth asking about up front.

Tax credits and rebates in 2026

Ended for 2026 installs

  • Federal 25C credit: ENDED for property placed in service after December 31, 2025 (One Big Beautiful Bill Act, Public Law 119-21). Before this, a panel upgrade could qualify for 30% up to $600 when it enabled a qualifying heat pump or heat pump water heater — that credit no longer applies to 2026 installs.

Uncertain — check your state directly

  • IRA Home Electrification rebates (HEEHR / formerly HEAR): Still authorized under the Inflation Reduction Act, with a federal cap of $4,000 toward a panel upgrade for income-qualified households as part of a broader electrification project. In practice, availability is inconsistent: as of mid-2026 only about a dozen states plus DC had actually launched a program, updated federal guidance removed eligibility for fuel-switching projects (e.g., replacing a gas system with electric), and some states' funds are already fully reserved. Check your state energy office's current program status directly before counting on this — do not assume it applies.

Can I do this myself?

This is not a practical DIY project in most of the country — electrical panel work requires a permit and a licensed electrician's inspection virtually everywhere. A few states (including Florida and Michigan) legally allow an owner-occupant to pull their own electrical permit and do the work on their own home, but even there, the utility-side connection — pulling or resetting the meter, coordinating the service disconnect — is always controlled by the utility, never a homeowner or even most contractors. There is no meaningful cost-savings DIY path here the way there is for a deck or a tile floor.

What these ranges don't include

National ranges, equipment + labor, for a single-family home. Base ranges assume standard access and a straightforward permit. Excludes utility coordination/disconnect fees (tariff-specific — ask your utility), grounding-system upgrades, and AFCI/GFCI circuit-by-circuit retrofits, none of which have a reliable national range.

Where these numbers come from

Ranges reconcile national published data — HomeGuide, Angi, This Old House, and Bob Vila installed medians — with figures already published elsewhere on this site (the 100-amp-vs-200-amp-service guide and the water heater replacement cost page), so this page doesn't contradict them. Labor-rate context comes from BLS OEWS electrician wage data; the tax-credit status was confirmed directly against the IRS's own published guidance, and the Federal Pacific Stab-Lok safety note was confirmed directly against CPSC's own investigation-closure record. The model is reviewed annually; this page was last computed from data updated . For your own project, the only numbers that matter more than these are the ones in three written bids from licensed local electricians — normalize each by scope before comparing.

Check your load before you get quotes

The free electrical load calculator estimates your home's actual demand using the NEC's standard method, so you can check whether you really need the upgrade a quote is recommending — no signup.

Open the Electrical Load Calculator →

Don't forget disposal in the budget

A project this size usually needs a rolloff dumpster, and rental plus overage fees are a real line item. See the right container size and what disposal typically adds to the budget.

Plan the disposal line item →

Frequently Asked Questions

How much does it cost to upgrade an electrical panel in 2026?

A same-amperage panel swap runs $1,300 to $3,000. The most common job — a full 100A to 200A service upgrade, including a new panel, meter base, service mast and utility coordination — runs $3,000 to $6,000. A subpanel addition (garage, ADU, workshop) without touching the main service runs $400 to $2,000. A jump to 400A is highly quote-dependent ($4,000 to $17,000) since it usually needs bigger utility-side equipment. Size your actual load first with the free electrical load calculator.

Do I actually need a 200A panel?

Not necessarily just because your panel is 100A. Research from Lawrence Berkeley National Laboratory found many homes can add a real load — like an EV charger — without a full panel or service replacement, because free breaker space and existing capacity matter more than the amperage number alone. Lawrence Berkeley National Laboratory estimates 100A and 200A panels make up roughly 55% and 29% of U.S. single-family panels respectively, and that at least 20% of panels of all sizes have no free breaker space left. The same research found many homes can actually accommodate additional loads (like an EV charger) without a full panel or service replacement — 100A alone doesn't automatically mean an upgrade is required; a licensed electrician's load calculation (NEC Article 220) is what actually answers that question. A licensed electrician's load calculation (NEC Article 220) is the way to actually answer this for your house, not a rule of thumb.

What triggers needing a panel upgrade?

The most common triggers are: Installing a Level 2 EV charger (a 40-50A dedicated circuit can push an older, fully loaded panel past capacity); Converting to a heat pump or going all-electric — full electrification most often needs at least a 200A panel under current code; Adding a hot tub, large addition, or other major new electrical load; A panel that's failing or unsafe regardless of amperage — this is a safety replacement, not a capacity upgrade. A failing or genuinely unsafe panel is a safety replacement regardless of amperage, not a capacity decision.

Is my Federal Pacific or Zinsco panel dangerous — was it recalled?

Federal Pacific Electric (FPE) "Stab-Lok" panels are widely flagged online as "recalled" — they were not. The Consumer Product Safety Commission investigated Stab-Lok breakers for two years and closed the investigation in March 1983 without issuing a recall, citing insufficient data, while noting it could reopen the matter. Many electricians and insurers still recommend replacing FPE and Zinsco panels on safety grounds, but describe it accurately as a recommendation, not a government-mandated recall.

Is there still a tax credit for an electrical panel upgrade?

No. ENDED for property placed in service after December 31, 2025 (One Big Beautiful Bill Act, Public Law 119-21). Before this, a panel upgrade could qualify for 30% up to $600 when it enabled a qualifying heat pump or heat pump water heater — that credit no longer applies to 2026 installs. Some state-run electrification rebate programs may still cover part of a panel upgrade as part of a larger project, but availability varies a lot by state and has gotten more restrictive — confirm current eligibility directly with your state's program before counting on it.

Can I upgrade my own electrical panel to save money?

This is not a practical DIY project in most of the country — electrical panel work requires a permit and a licensed electrician's inspection virtually everywhere. A few states (including Florida and Michigan) legally allow an owner-occupant to pull their own electrical permit and do the work on their own home, but even there, the utility-side connection — pulling or resetting the meter, coordinating the service disconnect — is always controlled by the utility, never a homeowner or even most contractors. There is no meaningful cost-savings DIY path here the way there is for a deck or a tile floor.

How long does a panel upgrade take?

The physical work is usually a single day (roughly 8-10 hours for a straightforward panel replacement, more for a relocation). Power is off for most of that day, since the utility disconnects service or pulls the meter to work safely. Permitting and utility coordination can take much longer than the work itself. A straightforward panel-only permit is often issued same-day or within a few days, but a full service upgrade that needs new utility-side equipment can enter a utility's planning queue, which is far less predictable and worth asking about up front. The whole-home surge protector now required on new or upgraded services under NEC 230.67 adds roughly $200–$800 to a job like this — worth asking whether your quote already includes it. National ranges, equipment + labor, for a single-family home. Base ranges assume standard access and a straightforward permit. Excludes utility coordination/disconnect fees (tariff-specific — ask your utility), grounding-system upgrades, and AFCI/GFCI circuit-by-circuit retrofits, none of which have a reliable national range.