Compacted vs loose asphalt — place compacted depth, order loose tons
Run tonnage on the COMPACTED depth, then bump the order for loose delivery: HMA ×1.10–1.15, aggregate base ×1.15–1.25 (4″ compacted base ≈ 4.6″ loose). Never compute tons from the loose depth.
What this diagram shows
A diagram showing that hot-mix asphalt and aggregate base are delivered loose and densify under the roller. A loose lift about three inches deep is compacted by a steel roller down to a 2.5-inch finished thickness. The tonnage formula always uses the final compacted depth, and the order quantity is then bumped up because material ships loose: hot-mix asphalt about 1.10 to 1.15 times and aggregate base about 1.15 to 1.25 times. For example, four inches of compacted crusher-run base is ordered as roughly 4.6 inches loose. Never plug the loose depth into the tonnage formula.
Asphalt Driveway Calculator
Calculate hot mix asphalt tons, aggregate base, tack coat & demo for residential driveways. NAPA & Asphalt Institute specs. Free, no signup.
Related diagrams
- Masonry, Stucco & Hardscape
Brick bond patterns compared — running, ⅓ running, stack, common, English, and Flemish
- Masonry, Stucco & Hardscape
Where bricks-per-square-foot comes from — the nominal brick-plus-joint cell
- Masonry, Stucco & Hardscape
Anchored brick-veneer wall section — air space, WRB, ties, flashing, and weep holes
- Masonry, Stucco & Hardscape
What goes under pavers — compacted base, bedding sand, joint sand, and edge restraint
- Masonry, Stucco & Hardscape
Paver laying patterns — running bond, herringbone, basketweave, and waste factors
- Masonry, Stucco & Hardscape
Why pavers need edge restraint — the perimeter creeps and unravels without it