Landscape Material Calculator

How much landscape material do you actually need? This free landscape material calculator gives DIYers and contractors a complete take-off — cubic yards, cubic feet, tons, bag counts at every retail bag size, and a truck-size and order-format recommendation — for every common landscape material in one tool. Crushed stone (#57, #67, #8, crusher run / road base), pea gravel, decomposed granite (natural / stabilized / resin), river rock (½"–8"), Mexican beach pebbles, lava rock, ASTM C33 concrete sand, ASTM C144 mason sand, play sand, fill sand, screened topsoil, loam, garden mix, compost, fill dirt, and PennDOT R-3 through R-8 riprap and one/two/three-man landscape boulders.

Three things separate the materials and trip up almost everyone the first time. First, density: a yard of crushed stone weighs about 2,700 lb but a yard of lava rock weighs only 1,300 lb — comparing per-ton prices alone makes lava rock look expensive when in cubic yards it's competitive. Second, compaction: crushed stone, crusher run, and decomposed granite shrink 15–25% during install, so you have to order more loose volume to land at the spec depth — the calculator handles this automatically. Third, the bag-vs-bulk break-even: under ½ yard, bagged from Home Depot is the right call; over 2 yards, bulk delivery saves $300–$600 per ton vs bagged retail.

Built on ASTM D448 / AASHTO M43 aggregate sizes, ASTM C33 (concrete aggregates) and ASTM C144 (mortar sand), USDA NRCS soil definitions, NCSA / PennDOT Pub 408 §703 R-class riprap and the parallel VDOT weight-based riprap classes, NSSGA / USGS Mineral Commodity Summaries production data, and supplier ticket density data — runs in under a minute, no signup.

View material estimation guides →

Landscape Material Calculator

Cubic yards, tons, and bag count for gravel, crushed stone, sand, decomposed granite, river rock, lava rock, topsoil, riprap, and landscape boulders — one calculator across every material.

Project area

Add a section for each shape — bed, path, ring around a tree. Areas are summed across sections.

Recommended for crushed stone — #57: 24".

Bed isn't a rectangle? See how to measure a circle, triangle, or ring

Multiple areas or depths? Total the volume

Material

Default density, compaction, and waste applied per material — override below if you have a supplier-specific spec

Crushed stone — #57 (1" minus, drainage / driveway top)ASTM D448 / AASHTO M43 #57 — most common US landscape grade. 100% pass 1½", 95–100% pass 1".
Planning density: 2,700 lb/yd³ (range 2,5652,835). Default compaction 20%, default waste 10%. Sold by the ton.

Why do cubic yards and tons differ by material? See the weight comparison

Bags, bulk delivery, or a dump truck? See which fits your order size

Compaction & waste (optional override)

Defaults applied per material. Override only if your supplier publishes a different value.

Compaction is the loose-to-compacted multiplier (decorative materials = 0%; crusher run / DG = 20–25%). Waste covers spillage, edge tolerance, and irregular shapes — bump to 15–20% on slopes or curved beds.

Getting a bulk landscape-material order right

The volume math is straightforward once you have the area — the three things that trip people up are measuring an oddly-shaped bed (a circle, triangle, or ring around a tree), reading the tons figure (the same cubic yard weighs very different amounts depending on the material), and deciding whether to buy bags, take bulk delivery, or a dump truck for the size of your order.

The shape-takeoff diagram is why you add a section per shape instead of forcing a bed into a rectangle. The calculator sums rectangles, circles, triangles, and rings — remembering to subtract a tree’s trunk gap — and total area times depth is the volume you order. Odd beds come out right when they are built from simple shapes.

A bed rarely is a clean rectangle. Add one section per shape and the calculator sums the areas: rectangle = L × W, circle = π(D/2)², triangle = ½ × B × H, and a ring around a tree = π(R² − r²) — remember to subtract the trunk gap. Total area × depth = the volume you order.Source: Plane-area geometry (rectangle, circle, triangle, annulus); section sum from the landscape calculatorSee the Landscape area take-off diagram →(opens in a new tab)

The density comparison is why the calculator does not convert yards to tons with one factor. Planning densities run widely between materials, so a cubic yard of lava rock and a cubic yard of riprap weigh very differently, and a ton of a light material covers far more ground. Comparing by volume, not weight, is why the estimate leads with cubic yards.

Cubic yards and tons don’t line up the same way for every material — planning densities run from ~1,300 lb/yd³ (lava rock) to ~3,000 lb/yd³ (riprap). So one cubic yard is 0.65 tons of lava rock but 1.5 tons of riprap, and a ton of a light material covers far more ground. Compare prices per cubic yard (volume), not per ton.Source: Planning densities (lb per loose yd³) from the landscape calculator MATERIALS tableSee the Landscape material weight diagram →(opens in a new tab)

The bag-versus-bulk diagram is why the order size decides the format. Under about a half yard, bags win on delivery minimums; past the break-even, bulk delivery beats bagging; and a half-ton pickup carries only about a yard. The calculator surfaces the crossover so the format matches the volume, not just the material.

The order size in cubic yards picks the format: under ~½ yd³, bagged (delivery minimums make bags practical); ½–2 yd³ is the crossover; past the ~2 yd³ break-even, bulk delivery on a single-axle dump (~5–8 yd³) wins; ≥ 6 yd³, a tandem dump (10–14 yd³) beats two loads. And a ½-ton pickup carries only ~1,500 lb — under one cubic yard for most materials.Source: formatRec thresholds and truck payloads from the landscape calculatorSee the Bagged diagram →(opens in a new tab)

Share this calculator with your customers

Run a contractor site, supply store, or blog? Drop this free landscape material calculator straight onto your own page so your visitors can estimate materials without leaving. No signup, works on any website — just copy and paste.

📚

Want to Learn More?

Calculate cubic yards, tons, and bags for gravel, crushed stone, sand, decomposed granite, river rock, topsoil, and riprap. ASTM D448 / AASHTO M43.

Read the Landscape Material Guide

Size a dumpster for this debris

Don't guess at the container size — overage fees run $100–$300+ when you hit the weight cap or fill past the line. See the right size for this material.

Get the right dumpster size →

Related Calculators

Explore Landscaping: calculators, diagrams & guidesEvery calculator, cross-section diagram, and guide for this trade in one place.

How to Use This Calculator

  1. Pick a shape for your project area: rectangle, circle, triangle, or annulus (ring around a tree). For irregular footprints, add multiple sections — areas are summed across sections.
  2. Enter dimensions in feet (length × width, diameter, base × height, or outer × inner diameter for the ring) and depth in inches.
  3. Pick the material: every common landscape material is in one dropdown — crushed stone, pea gravel, decomposed granite, river rock, lava rock, sand, topsoil, riprap, and landscape boulders. Density, default compaction, and default waste are applied per material.
  4. Pick a bag size for the bagged-equivalent count (0.5 cu ft for decorative rock and 50-lb sand, 1 cu ft, 1.5 cu ft and 2 cu ft for topsoil/compost, or 40-lb topsoil bags ≈ 0.75 cu ft).
  5. Optional: override the compaction or waste percentage if your supplier publishes a different value, and toggle "wet topsoil" to use the upper-end planning weight.
  6. Click Calculate: see cubic yards, cubic feet, tons (typical / low / high), estimated weight in pounds, bag counts at every bag size, the smallest truck that fits the load, and a bagged-vs-bulk-vs-tandem order-format recommendation.

Why density and compaction get more complicated than they look

Three things drive most ordering errors. (1) Density varies 1.5–3× across materials — a yard of lava rock weighs less than half what a yard of river rock weighs, so a per-ton price alone can't be compared across products. The calculator always shows BOTH cubic yards and tons. (2) Compactable materials (crushed stone, crusher run, DG, structural fill sand) shrink 15–25% during install — order the calculator's "loose" volume so the in-place compacted depth matches the spec. Decorative rounded materials (pea gravel, river rock, lava rock, beach pebbles, riprap, boulders) don't compact and use a 0% compaction multiplier. (3) Topsoil weight is the most variable number in landscape materials — Caterpillar tables span 1,000 lb/yd³ dry to 3,000 lb/yd³ saturated. Default planning weight is 2,200 lb/yd³ for damp screened topsoil; toggle the "wet" checkbox to bump it to the upper end of the range. Bag-vs-bulk break-even is roughly 2 cubic yards: under that, bagged retail is the practical choice; over that, bulk delivery saves 5×–24× per unit even after the $50–$150 delivery fee.

Frequently Asked Questions

How do I calculate cubic yards for landscape material?

The universal formula is (Length_ft × Width_ft × Depth_in) ÷ 324 = cubic yards. The 324 constant is (27 ft³ per yd³) × (12 in per ft) folded together — it converts square feet plus depth-in-inches directly to cubic yards in one step. Example: a 20 × 10 ft bed at 3 inches deep is (20 × 10 × 3) ÷ 324 = 1.85 yd³. Round shapes use π × radius² × depth ÷ 324. Triangles use (base × height ÷ 2) × depth ÷ 324. Rings (mulch around a tree) use π × (R_outer² − R_inner²) × depth ÷ 324. The shape take-off diagram shows the area formulas summed per section.

What's the difference between gravel and crushed stone?

Gravel is naturally rounded by water action (river rock, pea gravel) — it does not compact, drains freely, and looks decorative. Crushed stone is mechanically broken, so it has angular faces that interlock and compact tightly when vibrated. The calculator exposes this as a 'compactable: yes/no' flag because users overordering or underordering compactable material by 10–25% is the single most common landscape ordering error. Crushed stone is roughly 100–115 lb/ft³; rounded gravel is 95–105 lb/ft³ in undisturbed bulk.

How much does a cubic yard of landscape material weigh?

Density varies widely by material. Crushed stone (#57, #67) ≈ 2,700 lb/yd³ (1.35 t/yd³); crusher run / road base ≈ 3,000 lb/yd³ (1.50 t/yd³); pea gravel ≈ 2,800 lb/yd³ (1.40 t/yd³); decomposed granite ≈ 2,800 lb/yd³ loose (1.40 t/yd³); river rock 1"–2" ≈ 2,600 lb/yd³ (1.30 t/yd³); lava rock ≈ 1,300 lb/yd³ (0.65 t/yd³) — about half the weight of river rock; concrete sand ≈ 2,700 lb/yd³ (1.35 t/yd³); mason sand ≈ 2,500 lb/yd³ (1.25 t/yd³); damp screened topsoil ≈ 2,200 lb/yd³ (1.10 t/yd³); riprap 2,800–3,100 lb/yd³ (1.40–1.55 t/yd³). Wet topsoil and saturated sand can run 10–25% heavier. The tons-by-density diagram shows weight varying by material.

What is #57 stone, #67 stone, and where do the size numbers come from?

These are ASTM D448 / AASHTO M43 standard aggregate gradations — the same numbered sizes used by every U.S. quarry and DOT. #57 is the most common landscape grade: 100% pass 1½" sieve, 95–100% pass 1", 25–60% pass ½", with most material in the ½"–¾" range. #67 is one step down: 100% pass 1", 90–100% pass ¾". #8 is the pea-gravel-equivalent for concrete: 100% pass ½", 85–100% pass 3/8". #10 (also called 'screenings' or 'stone dust') is the smallest, used as paver setting bed and pathway compaction. Crusher run / DGA / road base is a #57-sized top blended with stone dust fines designed to compact tightly.

How much should I add for waste and compaction?

Two separate factors. Compaction (the loose-to-compacted multiplier): 20% for crushed stone and crusher run, 25% for decomposed granite, 17% for paver-base sand, 15% for topsoil settle. Decorative rounded materials (pea gravel, river rock, lava rock, beach pebbles, riprap, boulders) get 0% — they don't compact. Waste (spillage, edge tolerance, irregular shape): 5% for simple bagged install, 10% for standard projects, 15% for curved or sloped beds, 15–20% for riprap on slopes, 20% for boulders. The calculator applies both: Order = Calculated × (1 + Compaction%) × (1 + Waste%).

Should I order bagged or in bulk?

The break-even is roughly 2 cubic yards. Bagged decorative stone runs $300–$600 per ton equivalent (Bovees 2026 cost data); bulk delivered runs $25–$55 per ton — about 5×–24× cheaper per unit. Under 0.5 yd³, bulk delivery minimums (typically 1–3 yd³) and per-load fees ($50–$150) make bagged the practical choice. Between 0.5 and 2 yd³, either format works — depends on whether your local supplier offers small-bulk delivery and whether you can haul it. Over 2 yd³, bulk delivery is dramatically cheaper. Over 6 yd³, a tandem dump (10–14 yd³, 12–16 tons) is cheaper per unit than two single-axle loads. The bag-vs-bulk diagram shows the ~2 yd³ break-even.

How is riprap classified — what's the difference between R-class and VDOT class?

Two parallel systems. PennDOT, the National Crushed Stone Association (NCSA), and most northeastern, midwestern, and several southern states use R-3 through R-8 (size-based, in inches): R-3 is 2"–6", R-4 is 3"–12", R-5 is 4"–18", R-6 is 9"–24", R-7 is 12"–30", R-8 is 15"–42". VDOT and several southern states use Class AI / I / II / III and Type I / II (weight-based, in pounds): Class AI is 25–75 lb stone (≈ R-3/R-4), Class II is 150–500 lb (≈ R-5), Type I is 1,500–4,000 lb (≈ R-7). Both systems describe the same physical stone — only the naming differs. When in doubt, specify by d50 (median stone diameter) plus the application; the supplier translates.

What's the difference between topsoil and fill dirt?

Topsoil is the upper soil horizon (USDA 'A horizon') containing 1–6% organic matter — it supports plant growth. Fill dirt is subsoil from the B/C horizon — low organic content, intended for structural fill only. Plants grow poorly in fill dirt. For grade changes, the right approach is fill dirt for the bottom 60–70% of depth, capped with 4–6 inches of topsoil for the growing layer. Cost gap: fill dirt $5–$25/yd³ vs screened topsoil $25–$50/yd³. Some suppliers in heavy-clay regions (TX, OK) sell high-clay subsoil as 'topsoil' — verify with the supplier or ask for a 'screened loam' or 'super loam' upgrade.

Why is lava rock so much lighter than other rock?

Lava rock is porous volcanic material with vesicles (gas bubbles trapped during cooling). At ~1,300 lb/yd³ planning weight (range 1,100–1,500), it weighs less than half what river rock weighs (~2,600 lb/yd³). A ton of lava rock covers about 2.4× the area of a ton of river rock. This makes lava rock look expensive per ton but competitive per cubic yard of coverage — always compare in cubic yards, not tons. It's also the most regionally volatile decorative rock: sourced from western U.S. quarries (OR, ID, UT), shipping to East Coast destinations adds $80+/ton freight surcharges that can double the delivered cost.