HardiePanel vertical joints — land on a stud, then caulk or batten
Vertical panel seams must fall on a stud, then close with either a caulked gap over flashing or a batten / H-mold. The joint method drives the batten and trim count.
What this diagram shows
A horizontal section looking down through two fiber-cement panels meeting over a stud. Option A leaves a small gap between panels, sealed with caulk over joint flashing behind. Option B covers the seam with a batten or PVC H-molding. In both cases the vertical joint falls on framing — panels cannot be seamed in the middle of a stud bay. Which method you pick sets how many battens or trim pieces the calculator counts.
Use this diagram — free
You're welcome to use this diagram on your own site, blog, handout, or lesson at no cost. The only condition is a visible credit link back to the source page. Copy the snippet below and paste it into your page — the credit is already included.
Please keep the credit link intact and don't alter the diagram itself. Redistribution as part of a competing diagram library or template pack isn't permitted. Questions? Reach us via the site.
Was this diagram helpful?
Fiber-Cement Panel Calculator
Free fiber-cement panel calculator — 4x8/4x9/4x10 vertical HardiePanel sheets by column-and-row layout, with battens, trim, breakage and fasteners.